Home
Class 11
PHYSICS
A block of mass 5kg is being raised vert...

A block of mass `5kg` is being raised vertically upwards by the help of a string attached to it. It rises with an acceleration of `2ms^-2`. Find the work done by the tension in the string if the block rises by `2.5m`. Also find the work done by the gravity and the net work done.

Text Solution

Verified by Experts

Let us first calculate the tension. From figure
`T-mg=5a`, `T=5(10+2)=60N`
As T and displacement are in same direction (upwards), work done by the tension T is W.
`W=Ts=60(2.5)=150J`
Work done by gravity
`=-mgs=-5(10)(2.5)=-125J`
Net work done on the block= Work done by T+Work done by `mg`
`=150+(-125)=25J`
Promotional Banner

Topper's Solved these Questions

  • WORK, POWER & ENERGY

    CENGAGE PHYSICS|Exercise Solved Examples|15 Videos
  • WORK, POWER & ENERGY

    CENGAGE PHYSICS|Exercise Exercise 8.1|25 Videos
  • VECTORS

    CENGAGE PHYSICS|Exercise Exercise Multiple Correct|5 Videos

Similar Questions

Explore conceptually related problems

A mass M is lowered with the help of a string by a distance h at a distance acceleration g//2 . The work done by the string will be

A mass M is lowered with the help of a string by a distance h at a constant acceleration g//2 .The work done by the string will be :

A cord is used to lower vertically a block of mass M through a distance d at a constant acceleration g//4 . Find the work done by the cord on the block.

A string is used to pull a block of mass m vertically up by a distance h at a constant acceleration (g)/(3) . The work done by the tension in the string is

A mass "M" is lowered with the help of a string by a distance "h" at a constant acceleration (g)/(2) .The work done by the string will be

A block of 'm' is lowered with the help of a rope of negligible mass through a distance 'd' with an acceleration of g//3 . Find the work done by the rope on the block ?

A block of mass m tied to a string is lowered by a distance d, at a constant acceleration of g//3 . The work done by the string is

A block of mass m is kept on a platform Platform starts moving upwards with an acceleration of g/2 . Find the work done by the normal force on the block in the first one second.

A block of mass 2 kg is being brought down by a string. If the block acquires a speed 1(m)//(s) in dropping down 25 cm, find the work done by the string in the process.

A body of mass m is allowed to fall with the help of string with downward acceleration g/6 to distance x. The work done by the string is