Home
Class 12
MATHS
A factor manufactures two types of screw...

A factor manufactures two types of screws, A and B. Each type of screw requires the use of two machines, an automatic and a hand operated. It takes 4 minutes on the automatic and 6 minutes on hand operated machines to maufacture a package of screw s A, while it take 6 minutes on automatic and 3 minutes on the hand operated machines to maufacture a package of screws B. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a package of screws A at a profit of Rs. 7 and screws B at a profit of Rs 10. Assuming that he can sell all the screw he manufactures, how many packages of each type should the factory owner produced day in order to maximise his profit? Determine the maximum profit.

Text Solution

Verified by Experts

The correct Answer is:
The maximum value of Z is Rs 410 at B(30,20).
Thus, the factory should product 30 packages of screws A and 20 packages of screws B to get the maximum profit of Rs 410 .
Promotional Banner

Topper's Solved these Questions

  • LINEAR PROGRAMMING

    SUBHASH PUBLICATION|Exercise TRY YOURSELF|5 Videos
  • LINEAR PROGRAMMING

    SUBHASH PUBLICATION|Exercise TRY YOURSELF|5 Videos
  • INVERSET TRIGONOMETRIC FUNCTIONS

    SUBHASH PUBLICATION|Exercise TRY YOUR SELF|3 Videos
  • MATRICES

    SUBHASH PUBLICATION|Exercise TRY YOURSELF|10 Videos

Similar Questions

Explore conceptually related problems

A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of a grinding cutting machine and a sprayer . It takes 2 h on grinding cutting machine and 3 h on the sprayer to manufacture a pedestal lamp . It takes 1 h on the grinding cutting machine and 2 h on the sprayer to manufacture a shade . On any day, the sprayer is available for at the most 20 h and the grinding cutting machine for at the most 12 h . The profit from the sale of a lamp is Rs 5 and that from a shade is Rs 3 . Assuming that the manufacture can sell all the lamps and should he schedule his daily production in order to miximize his profit ?

A manufacturer produces nuts and bolts . It takes 1 hr of work on machine A and 3 hr on machine B to produce a package of nuts and bolts . He earns a profit of Rs 17.50 per package on nuts and Rs 7.00 per package on bolts . How many package of each should be produced each most 12 h a day to maximize the profit?

Find the ratio of the following:(d) 30 minutes to 45 minutes

The length of the minute hand of a clock is 14 cm. Find the area swept by the minute hand in 10 minutes.

The length of the minute hand of a clock is 14 cm. Find tdhe area swept by the minute hand in 5 minutes.

During exercise, the breathing rate is automatically enhanced. What is the reason behind it ?

Jaidev takes 2 ̶ 1/5 minutes to walk across the school ground. Rahul takes 7/4 minutes to do the same. Who takes less time and by what fraction?

A Company manufactures two types of novelty sovenirs made of plywood . Souvenirs of type A require 5 min each for cutting and 10 min each for assembling . Souvenirs of type B require 8 min each for cutting and 8 min each for assembling . There are 3 h 20 min available for cutting and 4 h for assembling . The profit is Rs 5 each for type A and Rs 6 each for type B souvenirs . How many souvenir of each type should the company manufacture in order to maximise the profit ?