Home
Class 12
MATHS
A tunnel through a mountain for a four ...

A tunnel through a mountain for a four lane highway is to have a elliptical opening. The total width of the highway ( not the opening ) is to be 16m , and the height at the edge of the road must be sufficient for a truck 4m high to clear if the highest point of the opening is to be 5m approximately. How wide must the opening be ?

Text Solution

Verified by Experts

The correct Answer is:
9.6m
Promotional Banner

Topper's Solved these Questions

  • TWO DIMENSIONAL ANALYTICAL GEOMETRY-II

    FULL MARKS|Exercise EXERCISE 5.6|25 Videos
  • TWO DIMENSIONAL ANALYTICAL GEOMETRY-II

    FULL MARKS|Exercise Additional Question Solved|44 Videos
  • TWO DIMENSIONAL ANALYTICAL GEOMETRY-II

    FULL MARKS|Exercise EXERCISE 5.4|8 Videos
  • THEORY OF EQUATIONS

    FULL MARKS|Exercise Additional Questions Solved|30 Videos

Similar Questions

Explore conceptually related problems

The stomach opens into

The radius of a conical tent is 7 m and the height is 24 m . Calculate the length of the canvas used to make the tent if the width of the rectangular canvas is 4m ?

An arc of a bridge is semi-elliptical with the major axis horizontal. If the length of the base is 9m and the highest part of the bridge is 3m from the horizontal, then prove that the best approximation of the height of the acr 2 m from the center of the base is 8/3mdot

A window is in the form of a rectangle surmounted by a semicircular opening. The total perimeter of the window is 10 m. Find the dimensions of the window to admit maximum light through the whole opening.

The arch of a bridge is the shape of a semi ellipse having a horizontal span of 40 m and 16 m highest the centre. How high is the arch, 10m from the right/ left of the centre.

Which of the following have an open circulatory system?