Home
Class 12
MATHS
A company manufactures two tpyes of nove...

A company manufactures two tpyes of novely souvenirs made of plywood. Souvenirs of type A require 5 minuts each for cuting and 10 minuts each for assembling. Souvenirs of type B require 8 minutes each for cutting and 8 minutes each for assembling. There are 3 hours for assembling. The profit is Rs. 5 each for type A and Rs 6 each for type should the company mafnufacture in order to maximise the profit ?

Promotional Banner

Topper's Solved these Questions

  • LINEAR PROGRAMMING

    NEW JOYTHI PUBLICATION|Exercise ADDITIONAL QUESTIONS FOR PRACTICE 12.2|6 Videos
  • LINEAR PROGRAMMING

    NEW JOYTHI PUBLICATION|Exercise NCERT MISCELLANEOUS EXERCISE|10 Videos
  • LINEAR PROGRAMMING

    NEW JOYTHI PUBLICATION|Exercise NECERT TEXT BOOK EXERCISE 12.1|10 Videos
  • LINEAR INEQUALITIES

    NEW JOYTHI PUBLICATION|Exercise QUESTIONS FROM COMPETITIVE EXAMS|38 Videos
  • MATHEMATICAL REASONING

    NEW JOYTHI PUBLICATION|Exercise QUESTION FROM COMPETITIVE EXAMS|23 Videos

Similar Questions

Explore conceptually related problems

How many hours are there in a minute?

Find the measure of the angle made by the minute hand in 40 minutes

A manufacturer makes two types of toys A and B. Three machines are needed for this purpose and the time in minutes, required for each toy on the machines is given below: Each machine is available for a maximum of 6 hours per day. If the profit on each toy of type A is Rs 7.50 and that on each toy of type B is Rs 5, show that 15 toys of type A and 30 of type B should be manufactured in a day to get maximum profit.

A factory manufactures two types of screws, A and B. Each type of screw requires the use of two machines, an automatic and a hand operated. It takes 4 minutes on the automatic and 6 minutes on hand operated machines to manufacture a package of screws A while its takes 6 minutes on automatic and 3 minutes on the hand operated machines to manufacture a package of screws B. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a package of screws A at a profit of Rs. 7 and screws B at a profit of Rs. 10 Assuming that he can sell all the screws he manufactures, how many packages of each type should the factory owner produce in a day in order to maximise his profit ? Determine the maximum profit.

A manufacturing company makes tow models A and B of product. Each piece of model A reqwuires 9 labour hours for fabricating and 1 hour labour for finishing . Each piece of model Brequires 12 labour hours for fabricating and 3 labour hours for fininshing. for fabricating and finishing, the maximum labour hours available are 180 and 30 respectively. The company makes a profit of Rs. 8,000 on each piece of modle A and Rs 12,000 on each piece of model B. How many pieces of model A and B should be manufactured per week to realise a maximum profit ? What is the maximum profit per week ?

What are the types of cofactors? Explain each of them.

Give the different types of friction and explain each with an example.

A toy company manufactures two types of dolls, A and B. Market tests and available resources have indicated that the combined production level should not exceed 1200 dolls per week and the demand for detts of type B is utmost half of that for dolls of type A. Further, the production level of dolls of type A can exceed three times the production of dolls of other type by utmost 600 units . If the company makes profit Rs 12 Rs. 16 per doll respectively on dolls a and B, how many of each should be produced weekly in order to maximise the profit ?