Home
Class 12
PHYSICS
it requires 50 muJ of work to carry a 2 ...

it requires `50 muJ` of work to carry a `2 muC` charge from a paint R to S. What is the potential difference between these points ? Which point is at higher potential ?

Promotional Banner

Similar Questions

Explore conceptually related problems

The amount of work done to move 20C charge from one point to another is 220 J. What is the potential difference between these two points ?

What is the potential difference between the surface and interior point of charged conductor?

The potential difference between points A and B from the figure is

2.5 mJ of work is done in moving a charge of 10^(-3) from one point to another.What is the potential difference between the two points ?

5 J of work is done in moving a positive charge of 0.5C between two points. What is the potential difference between these points ?

5J of work is done in moving a positive charge of 0.5C between two points. What is the potential difference between the points?

5J work is done in moving a positive charge of 0.5 C between two points. What is the potential difference between these points?

The work done in moving a charge of 2C across two poits in a circuit is 2J. What is the potential difference between the points ?