Home
Class 12
MATHS
A factory makes tennis rackets and crick...

A factory makes tennis rackets and cricket bats. A tennis racket takes 1.5 hours of machine time and 3 hours of craftman's time in its making while a cricket bat takes 3 hour of machine time and 1 hour of craftman's time.In a day, the factory has the availability of not more than 42 hours of machine time and 24 hours of craftman's time.
(i) What number of rackets and bats must be made if the factory is to work at full capacity?
(ii) If the profit on a racket and on a bat is Rs. 20 and Rs. 10 respectivelh, find the maximum profit of the factory when it works at full capacity.

Promotional Banner

Topper's Solved these Questions

  • LINEAR PROGRAMMING

    NCERT BANGLISH|Exercise MISCELLANEOUS EXERCISE|8 Videos
  • LINEAR PROGRAMMING

    NCERT BANGLISH|Exercise EXERCISE 12.1 (SHOW THAT THE MINIMUM OF Z OCCURS AT MORE THAN TWO PONTS)|4 Videos
  • INVERSE TRIGONOMETRIC FUNCTIONS

    NCERT BANGLISH|Exercise MISCELLANEOUS EXERCISE|17 Videos
  • MATRICES

    NCERT BANGLISH|Exercise Miscellaneous Exercise on Chapter 3|15 Videos

Similar Questions

Explore conceptually related problems

Total filtrate formed in 24 hours in human kidney is

The angular velocity of the hour hand of a watch is:

A manufacture produces nuts and bolts for industrial machinery. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts while it takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. If he operates his machines for at most 12 hours then formulate the given data in the form of inequations and show graphically the region representing the solution of these inequations.

Angular velocity of the hour hand of a clock is

Starting with a bacterium that divides once in half hour how many bacteria are formed after 24 hours of growth ?

Find the circular value of an angle formed by the end point of hour of a clock in 1 hour rotation.

A manufacturer produces nuts and bolts. It takes 1 hour of worl in machine A and 3 hours on machine B to produce a package of nuts. It take 3 hours on machien A and 1 hour on machine B to produce a package of bolts. He earns a profit of Rs. 17.50 per package on nuts and Rs. 7.00 per package on bolts. How many packages of each should be produced each day so as to maximise bis profit, if he operates his machines for at the most 12 hours a day?

A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of a grinding/ cutting machine and a sprayer. It takes 2 hours on grinding/cutting machine and 3 hours on the sprayer to manufacture a pedestal lamp. It takes 1 hour onthe grinding /cutting machine and 2 hours on the sprayer to manufacture a shade. On any day, the sprayer is available for at the most 20 hours and the grinding /cutting machine for at the most 12 hours. The profit from the sale of a lamp is Rs. 5 and that from a shade is Rs. 3. Assuming that the manufacturer can sell all the lamps and shades that he produces, how should he schedule his daily production in order to maximise his profit?

In a certain culture the rate of increment of bacterial at any instant is proportional to the cube root of the number of bacteria present at that instant. IF the number of bacteria becomes 8 times in 3 hours, in how much time that number becomes 64 times?