Home
Class 11
PHYSICS
Calculate the work done by a force of 30...

Calculate the work done by a force of 30 N in lifting load of 2g to a height of 10 m `(g = 10 ms^(-2))`.

Promotional Banner

Similar Questions

Explore conceptually related problems

Calculate the work done to take an object of mass 20 kg to a height of 10 m. (g = 9.8 m/s2)

Calculate the work done in lifting a 300N weight to a height of 10m with an acceleration 0.5ms^(-2) . Take g= 10ms^(-2) .

Calculate the worked done in lifting a 300N weight to a height of 10m with an accelertaion 0.5ms^(2) . Take g= 10ms^(-2) .

Calculate the work done in lifting 200 kg of water through a vertical height of 6 meters (Assume g = 10 m//s^(2) ).

Work is required to lift a body through a height from the ground, Calculate the work done in lifting a body of mass 10 kg to a height of 10m above the ground.