Home
Class 12
MATHS
A manufacturer produces nuts and bolts. ...

A manufacturer produces nuts and bolts. It takes 2 hours work on machine A and 3  hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 2 hours on machine B to produce a package of bolts. He earns a profit of Rs. 24 per package on nuts and Rs. 18 per package on bolts. How many packages of each should be produced each day so as to maximize his profit, if he operates his machines for at the most 10 hours a day. Make an L.P.P. from above and solve it graphically ?

Text Solution

AI Generated Solution

Promotional Banner

Topper's Solved these Questions

  • EXAM REVISION SERIES

    XII BOARD PREVIOUS YEAR PAPER ENGLISH|Exercise All Questions|19 Videos

Similar Questions

Explore conceptually related problems

A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit of Rs 17.50 per package on nuts and Rs 7.00 per package on bolts. How many packages of each should be produced each day so as to maximise his profit, if he operates his machine for at most 12 hours a day?

A small firm manufactures necklaces and bracelets. The total number of necklaces and bracelets that it can handle per day is at most 24. It takes 1 hour to make a bracelet and half an hour to make a necklace. The maximum number of hours available per day is 16. If the profit on a necklace is Rs 100 and that on a bracelet is Rs 300, how many of each should be produced daily to maximize the profit?

A factory manufactures two types of screws, A and B. Each type of screw requires the use of two machines, an automatic and a hand operated. It takes 4 minutes on the automatic and 6 minutes on hand operated machines to manufacture a package of screws A, while it takes 6 minutes on automatic and 3 minutes on the hand operated machines to manufacture a package of screws B. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a package of screws A at a profit of 70 paise and screws B at a profit of Rs 1. Assuming that he can sell all the screws he manufactures, how many packages of each type should the factory owner produce in a day in order to maximise his profit? Formulate the above LPP and solve it graphically and determine the maximum profit.

A factory manufactures two types of screws, A and B. Each type of screw requires the use of two machines, an automatic and a hand operated. It takes 4 minutes on the automatic and 6 minutes on hand operated machines to manufacture a package of screws A, while it takes 6 minutes on automatic and 3 minutes on the hand operated machines to manufacture a package of screws B. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a package of screws A at a profit of 70 paise and screws B at a profit of Rs 1. Assuming that he can sell all the screws he manufactures, how many packages of each type should the factory owner produce in a day in order to maximise his profit? Formulate the above LPP and solve it graphically and determine the maximum profit.

Manufacturer produces two types of steel trunks. He has two machines, A and B. The first type of trunk requires 3 hours on machine A and 3 hours on machine B. The second type requires 3 hours on machine A and 2 hours on machine B. Machines A and B can work at most for 18 hours and 15 hours per day respectively. He earns a profit of Rs. 30 per trunk on the first type of trunk and Rs. 25 per trunk on the second type. Formulate a linear programming problem to find out how many trunks of each type he must make each day to maximize his profit.

A manufacturer produces two types of steel trunks. He has tow machines A and B. For completing, the first types of the trunk requires 3 hours on machine A and 3 hours on machine B, whereas the second type of the trunk requires 3 hours on machine A and 2 hours on machine B. Machines A and B can work at most for 18 hours and 15 hours per day respectively. He earns a profit of Rs. 30 and Rs. 25 per trunk of the first type and the second respectively. How many trunks of each type must he make each day to makes maximum profit?

A factory manufactures two types of screws, A and B, each type requiring the use of two machines, an automatic and a hand-operated. It takes 4 minutes on the automatic and 6 minutes on hand-operated machines to manufacture a packet of screws 'A', while it takes 6 minutes on the automatic and 3 minutes on the hand-operated machines to manufacture a packet of screws 'B'. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a packet of screws 'A' at a profit of 70 paise and screws 'B' at a profit of Rs. 1. Assuming that he can sell all the screws he manufactures, how many packets of each type should the factory owner produce in a day in order to maximise his profit ? Formulate the above L.P.P. and solve it graphically and find the maximum profit.

Carina has 100 ounces of coffee divided into 5 - and 10 - ounce packages. If she has 2 more 5 - ounce packages than 10 - ounce packeages, how many 10 - ounce packages does she have?

A factory requires 42 machines to produce a given number of articles in 63 days. How many machines would be required to produce the same number of articles in 54 days?

A factory makes tennis rackets and cricket bats. A tennis racket takes 1. 5 hours of machine time and 3 hours of craftmans time in its making while a cricket bat takes 3 hours of machine time and 1 hour of craftmans time. In a day, the factory has the availability of not more than 42 hours of machine time and 24 hours of craftsmans time. If the profit on a racket and on a bat is Rs. 20 and Rs. 10 respectively, find the number of tennis rackets and crickets bats that the factory must manufacture to earn the maximum profit. Make it as an L.P.P. and solve graphically.

XII BOARD PREVIOUS YEAR PAPER ENGLISH-BOARD PAPER SOLUTIONS-All Questions
  1. Evaluate :int(3x-2)sqrt(x^2+x+1) dx

    Text Solution

    |

  2. In answering a question on a multiple choice test, a student either kn...

    Text Solution

    |

  3. A manufacturer produces nuts and bolts. It takes 2 hours work on machi...

    Text Solution

    |

  4. Solve the differential equation : (xsin^2(y/x)-y)dx+xdy=0 given y=pi/4...

    Text Solution

    |

  5. The sum of surface areas of a sphere and a cuboid with sides x/3,x and...

    Text Solution

    |

  6. Show that the relation R in the set A = {1, 2, 3, 4, 5} given by R = {...

    Text Solution

    |

  7. Using properties of determinants, solve for x:|[a+x, a-x, a-x],[ a-...

    Text Solution

    |

  8. A trust fund has Rs. 35,000 is to be invested in two different types o...

    Text Solution

    |

  9. Find the solution f the differential equation (dy)/(dx)=x^3e^(-2y)dot

    Text Solution

    |

  10. In the interval pi/2 lt x lt pi, find the value of x for which the mat...

    Text Solution

    |

  11. Write the vector equation of the line passing through (1,2,3) and pe...

    Text Solution

    |

  12. Express the matrix A=[[2,4,-6],[ 7,3,5],[ 1,-2, 4]] as the sum of a sy...

    Text Solution

    |

  13. Write the direction ratios of the vector 3 vec a+2 vec b where vec a=...

    Text Solution

    |

  14. Find the vector and cartesian equations of the plane passing through t...

    Text Solution

    |

  15. Solve the differential equation (dy)/(dx)-3ycotx=sin2x given y=2 when ...

    Text Solution

    |

  16. Solve for x :tan^(-1)((1-x)/(1+x))=1/2tan^(-1)x ,x >0

    Text Solution

    |

  17. Prove that 2tan^(-1)(1/2)+tan^(-1)(1/7)=sin^(-1)((31)/(25sqrt(2)))

    Text Solution

    |

  18. Find : int0^(1/(sqrt(2)))(sin^(-1)x)/((1-x^2)^(3/2))dx

    Text Solution

    |

  19. Find : intx/((x^2+1)(x-1))dx

    Text Solution

    |

  20. Find the areas of the region {(x , y): y^2lt=4x ,4x^2+4y^2lt=9}, using...

    Text Solution

    |