Home
Class 12
MATHS
A company produces two types of cricket ...

A company produces two types of cricket balls A and B.The production time of one ball of type B is double the type A(time in units ).The company has the time to produce a maximum of 2000 balls per day.The supply of raw materials is sufficient for the production of 1500 balls (both A and B) per day.The company wants to make maximum profit by making profit of Rs.3 from a ball type of A and Rs.5 from type B.Then,
How many balls should be produced in each type per day in order to get maximum profit?

Promotional Banner

Topper's Solved these Questions

  • INVERSE TRIGNOMETRY

    MAXIMUM PUBLICATION|Exercise EXAMPLE|42 Videos
  • MATRICES

    MAXIMUM PUBLICATION|Exercise EXAMPLE|119 Videos

Similar Questions

Explore conceptually related problems

A company produces two types of cricket balls A and B.The production time of one ball of type B is double the type A(time in units ).The company has the time to produce a maximum of 2000 balls per day.The supply of raw materials is sufficient for the production of 1500 balls (both A and B) per day.The company wants to make maximum profit by making profit of Rs.3 from a ball type of A and Rs.5 from type B.Then, Write the constraints.

A company produces two types of cricket balls A and B.The production time of one ball of type B is double the type A(time in units ).The company has the time to produce a maximum of 2000 balls per day. The supply of raw materials is sufficient for the production of 1500 balls (both A and B) per day. The company wants to make maximum profit by making profit of Rs.3 from a ball type of A and Rs.5 from type B. Then, By defining suitable variables write the objective function.

A bakery owner makes two types of cakes A and B.There machines are needed for this purpose.The time(in minutes) required for making each type of cakes in each machine is given below, Each machine is available for atmost 6 hours per day.Assume that all cakes will be sold out everyday.The bakery owner wants to make maximum profit per day by making Rs.7.5 from type A and Rs.5 from type B. Find the maximum profit graphically.

A bakery owner makes two types of cakes A and B. Three machines are needed for this purpose.The time (in minutes) requried for making each type of cake in each of the machines is given below: Each machine is available for atmost 6 hours per day. Assume that all cakes will be sold out every day.The bakery owner wants to make maximum profit per day by making 7.50 from type A and 5 from type B. write the object function

A bakery owner makes two types of cakes A and B. Three machines are needed for this purpose.The time (in minutes) requried for making each type of cake in each of the machines is given below: Each machine is available for atmost 6 hours per day. Assume that all cakes will be sold out every day.The bakery owner wants to make maximum profit per day by making 7.50 from type A and 5 from type B. Write the constraints

A company produces two types of goods, A and B , that require gold and silver. Each unit of type A requires 3 gm of silver and 1 gm of gold while that of type B requires 1 gm of silver and 2 gm of gold. The company can use 9 gm of silver and 8 gm of gold. If each unit of type A brings a profit of Rs. 40 and that of type B Rs. 50 , find the number of units of each type that the company should produce to maximise the profit. What is the maximum profit.

A company manufactures two types of rovelty souvenirs made of plywood. Souvenirs of type A require 5 minutes each for cutting and 10 minutes each for assembling. Souvenirs of type B require 8 minutes each for cutting and 8 minutes each for assembling. There are 3 hours 20 minutes available for cutting and 4 hours for assembling. The profit is Rs 5 each for type A and Rs 6 each for type B souvenirs. How many souvenirs of each type should the company manufacture in order to maximise the profit?

A factory manufactures two types of screws, A and B . Each type of screw requires the two machines, an automatic and a hand operated.It takes 4 minutes on the automatic and 6 minutes on hand operated machines to manufacture a package of screws A, while it takes 6 minutes on automatic and 3 minutes on the hand operated machines to manufacture a package of screws B. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a package of screw A at a profit of Rs 7 and screws B at a profit of Rs 10 . Assuming that he can sell all the screws he manufactures, how many packages of eách type should the factory owner produce in a day in order to maximise his profit? Determine the maximum profit.

MAXIMUM PUBLICATION-LINEAR PROGRAMMING-EXAMPLE
  1. Consider the linear programming problem: Maximum z=50x+40y subject...

    Text Solution

    |

  2. Consider the linear programming problem: Maximum z=50x+40y subject...

    Text Solution

    |

  3. Consider the linear programming problem: Maximum z=50x+40y subject...

    Text Solution

    |

  4. A furniture dealer sells only tables and chairs.He has Rs.12,000 to in...

    Text Solution

    |

  5. A furniture dealer sells only tables and chairs.He has Rs.12,000 to in...

    Text Solution

    |

  6. A furniture dealer sells only tables and chairs.He has Rs.12,000 to in...

    Text Solution

    |

  7. A company produces two types of cricket balls A and B.The production t...

    Text Solution

    |

  8. A company produces two types of cricket balls A and B.The production t...

    Text Solution

    |

  9. A company produces two types of cricket balls A and B.The production t...

    Text Solution

    |

  10. The graph of linear programing problem is given below.The shaded regio...

    Text Solution

    |

  11. The graph of linear programing problem is given below.The shaded regio...

    Text Solution

    |

  12. The graph of linear programming problem is given below.The shaded regi...

    Text Solution

    |

  13. The graph of linear programming problem is given below.The shaded regi...

    Text Solution

    |

  14. The graph of linear programing problem is given below.The shaded regio...

    Text Solution

    |

  15. A manufacturur produces nuts and bolts.It takes 1 hour of work on mach...

    Text Solution

    |

  16. A manufacturur produces nuts and bolts.It takes 1 hour of work on mach...

    Text Solution

    |

  17. A manufacturur produces nuts and bolts.It takes 1 hour of work on mach...

    Text Solution

    |

  18. A bakery owner makes two types of cakes A and B. Three machines are ne...

    Text Solution

    |

  19. A bakery owner makes two types of cakes A and B.There machines are nee...

    Text Solution

    |

  20. In factory there are two machines A and B producing toys.They respecti...

    Text Solution

    |