Home
Class 12
MATHS
A manufacture produces nuts and bolts. T...

A manufacture produces nuts and bolts. The time required to produce one packet of nuts and one packet of bolts on machines. A and B is given the following table.
He earns a profit of Rs. 25 per packet of nuts and Rs. 12 per packet of bolts. He operates his machine for atmost 15 hours a day. Formulate a linear programming problem to maximise his profit.

Promotional Banner

Topper's Solved these Questions

  • MATRICES

    MAXIMUM PUBLICATION|Exercise EXAMPLE|119 Videos
  • PROBABILITY

    MAXIMUM PUBLICATION|Exercise EXAMPLE|144 Videos

Similar Questions

Explore conceptually related problems

A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns profit of Rs. 17.50 per package on nuts and Rs. 7.00 per package on bolts. Formulate the above LPP if the machine operates for at most 12 hours a day

A manufacturur produces nuts and bolts.It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts.He earns a profit of Rs.17.50 per package on nuts and Rs.7 per package on bolts.How many package of each should be produced each day so as to maximise the profit,if he operates his machine for at the most 12 hours a days? Formulate the problem as a linear programming problem.

A manufacturur produces nuts and bolts.It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts.He earns a profit of Rs.17.50 per package on nuts and Rs.7 per package on bolts.How many package of each should be produced each day so as to maximise the profit,if he operates his machine for at the most 12 hours a days? Solve the LPP graphically and find the number of packages of nuts and bolts to be manufactured.

A manufacturur produces nuts and bolts.It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts.He earns a profit of Rs.17.50 per package on nuts and Rs.7 per package on bolts.How many package of each should be produced each day so as to maximise the profit,if he operates his machine for at the most 12 hours a days? By suitable defining the variables write the objective function of the problem.

(Manufacturing problem) A manufacturer has three machines I , II and III installed in his factory. Machines I and II are capable of being operated for at most 12 hours where as machine III must be operated for atleast 5 hours a day. She produces only two items M and N each requiring the use of all the three machines. The number of hours required for producing 1 unit of each of M and N on the three machines are given in the following table: She makes a profit of Rs 600 and Rs 400 on items M and N respectively. How many of each item should she produce so as to maximise her profit assuming that she can swll all the items that she produced ? What will be the maximum profit ?

A firm produces two different products A and B . Each product has to undergo three operations before it takes the final shape. The profit per unit and time required per unit of each product in each operation is tabulated below: To formulate a linear programming problem write Packing constraints.

A firm produces two different products A and B . Each product has to undergo three operations before it takes the final shape. The profit per unit and time required per unit of each product in each operation is tabulated below: To formulate a linear programming problem write Mixing constraints.

A firm produces two different products A and B . Each product has to undergo three operations before it takes the final shape. The profit per unit and time required per unit of each product in each operation is tabulated below: To formulate a linear programming problem write Objective function

A firm produces two different products A and B . Each product has to undergo three operations before it takes the final shape. The profit per unit and time required per unit of each product in each operation is tabulated below: To formulate a linear programming problem write Cutting constraints.

A manufacture make two types of furniture,chairs and tables.Both the products are processed on three machines A_1,A_2 and A_3 .Machine A_1 requires 3 hours for a chair and 3 hours for a table,machine A_2 requires 5 hours for a chair and 2 hours for a table and machine A_3 requires 2hours for a chair and 6 hours for a table.Maximum time available on machine A_1,A_2 and A_3 is 36 hours,50 hours and 60 hours respectively.Profits are Rs.20 per chair and Rs.30 per table.Formulate the above as a linear programming problem to maximize the profit.

MAXIMUM PUBLICATION-MODEL QUESTION-EXAMPLE
  1. Consider the relation in the set N of natural numbers defined as R={(a...

    Text Solution

    |

  2. Find the area bounded by the curve y=cosx and x axis between x=0 and x...

    Text Solution

    |

  3. A manufacture produces nuts and bolts. The time required to produce on...

    Text Solution

    |

  4. Consider the curve y=x^3+8x+3.Find the point on the curve at which the...

    Text Solution

    |

  5. Consider the curve y=x^3+8x+3 Does there exist a tangent to the curv...

    Text Solution

    |

  6. Which of the following functions is not continues at zero? f(x)=sinx...

    Text Solution

    |

  7. Which of the following functions is not continues at zero? f(x)={(si...

    Text Solution

    |

  8. Test continuity for the following function at zero? f(x)={(sin(1/x),...

    Text Solution

    |

  9. Test continuity for the folowing functions. f(x)={(xsin(1/x), x ne0)...

    Text Solution

    |

  10. Find the values of a and b such that function defined by f(x)={(10,,...

    Text Solution

    |

  11. Consider the plane 2x-3y+z=5. Find the Equation of the plane passing t...

    Text Solution

    |

  12. Consider the vectors veca=2i+j+3k,vecb=i+4j-k.Find the projection of v...

    Text Solution

    |

  13. Consider the vectors If veca is perpendicular to a vector vecc then pr...

    Text Solution

    |

  14. Consider the vectors veca=2i+j+3k,vecb=i+4j-k Write a vector vecd ...

    Text Solution

    |

  15. Find int(4x+7)sqrt(x^2+4x+13dx

    Text Solution

    |

  16. Write integrating factor of the linear differential equation (dy/dx)+(...

    Text Solution

    |

  17. Slope of the tangent to a curve at any point is twice the x coordinate...

    Text Solution

    |

  18. Solve the linear programming problem graphically Maximise Z=3x+5y ...

    Text Solution

    |

  19. If cos^-1(12/13)=tan^-1x then find x.

    Text Solution

    |

  20. Show that cos^-1(4/5)+cos^-1(12/13)=tan^-1(56/33)

    Text Solution

    |