Home
Class 14
MATHS
A can do a certain job in 15 days. B is ...

A can do a certain job in 15 days. B is 50% more efficient than A. Then B can do the same piece of work in

A

15

B

10

C

12

D

17

Text Solution

AI Generated Solution

The correct Answer is:
To solve the problem step by step, we will determine how long it takes for B to complete the same job that A can do in 15 days, given that B is 50% more efficient than A. ### Step-by-Step Solution: 1. **Determine A's Efficiency**: - A can complete the job in 15 days. - If we consider A's efficiency as 100 units of work per day, then in 15 days, A completes: \[ \text{Total Work} = \text{Efficiency of A} \times \text{Time taken by A} = 100 \times 15 = 1500 \text{ units of work} \] 2. **Calculate B's Efficiency**: - B is 50% more efficient than A. - Therefore, B's efficiency can be calculated as: \[ \text{Efficiency of B} = \text{Efficiency of A} + 50\% \text{ of Efficiency of A} = 100 + 50 = 150 \text{ units of work per day} \] 3. **Calculate Time Taken by B**: - Since both A and B are doing the same amount of work (1500 units), we can set up the equation: \[ \text{Total Work} = \text{Efficiency of B} \times \text{Time taken by B} \] - Substituting the known values: \[ 1500 = 150 \times \text{Time taken by B} \] - To find the time taken by B, we rearrange the equation: \[ \text{Time taken by B} = \frac{1500}{150} = 10 \text{ days} \] 4. **Conclusion**: - Therefore, B can complete the same piece of work in **10 days**. ### Final Answer: B can do the same piece of work in **10 days**. ---
Promotional Banner

Topper's Solved these Questions

  • MENSURATION

    QUANTUM CAT|Exercise QUESTION BANK|449 Videos
  • PERCENTAGES

    QUANTUM CAT|Exercise QUESTION BANK|271 Videos

Similar Questions

Explore conceptually related problems

A can do a certain job in 12 days. B is 60% more efficient than A. To do the same job B alone would take?

A can do a piece of work in 15 days. B is 50% more efficient than A, B can finish it in

A can do a certain job in 12 days.B is 60% more efficient than A.how many days does B alone take to do the same job?

A can do a certain job in 12 days. B in 60% more efficient than A. What is the number of days it takes B to do the same piece of work ?

QUANTUM CAT-NUMBER SYSTEM-QUESTION BANK
  1. In a set of first 180 natural numbers find the number of prime numbers...

    Text Solution

    |

  2. In a set of first 1000 natural numbers find the number of prime number...

    Text Solution

    |

  3. A can do a certain job in 15 days. B is 50% more efficient than A. The...

    Text Solution

    |

  4. Although Ravi felt lonely in his fight against the wrong, he decided t...

    Text Solution

    |

  5. The average of marks in English for ten students was found to be 45. L...

    Text Solution

    |

  6. Ravikishan is a sales executive who has five different simcard for his...

    Text Solution

    |

  7. The following figure shows the three gears, which work in tandem. That...

    Text Solution

    |

  8. An integer n is called square free if does not have divisor of the for...

    Text Solution

    |

  9. How many positive integral solutions exist for : ab+cd = a+b+c+d, wher...

    Text Solution

    |

  10. a, b, c and d are four consecutive numbers. If the sum of a and d is 1...

    Text Solution

    |

  11. Windows 8,- an operating system of Tablets and Mobile phones that can ...

    Text Solution

    |

  12. A man deposited Rs. 300 for 2 years, Rs. 600 for 4 years and Rs. 1200 ...

    Text Solution

    |

  13. Windows 8,- an operating system of Tablets and Mobile phones that can ...

    Text Solution

    |

  14. An athlete runs 400 meters race in 25 seconds. His speed (in km/hr) is

    Text Solution

    |

  15. What is the maximum integral value of m, if n<0 and m = n+(285)/n ?

    Text Solution

    |

  16. Find the value of abc, if a, b and c are integers amd a+1/(b+1/c) = (3...

    Text Solution

    |

  17. Minimum how many steps are required to break apart all the pieces of t...

    Text Solution

    |

  18. For any set of real numbers R = {a,b,c} let sum of pairwise product S ...

    Text Solution

    |

  19. A running man crosses a bridge of length 500 meters in 4 minutes. At w...

    Text Solution

    |

  20. Sania wanted to cut a cubical cake into 120 identical pieces applying ...

    Text Solution

    |