Home
Class 11
PHYSICS
A block of mass 5kg is being raised vert...

A block of mass `5kg` is being raised vertically upwards by the help of a string attached to it. It rises with an acceleration of `2ms^-2`. Find the work done by the tension in the string if the block rises by `2.5m`. Also find the work done by the gravity and the net work done.

Text Solution

AI Generated Solution

To solve the problem step by step, we will calculate the work done by the tension in the string, the work done by gravity, and then the net work done. ### Step 1: Calculate the Tension in the String The tension \( T \) in the string can be calculated using the formula: \[ T = mg + ma \] where: ...
Promotional Banner

Topper's Solved these Questions

  • WORK, POWER & ENERGY

    CENGAGE PHYSICS ENGLISH|Exercise Solved Examples|15 Videos
  • WORK, POWER & ENERGY

    CENGAGE PHYSICS ENGLISH|Exercise Exercise 8.1|25 Videos
  • VECTORS

    CENGAGE PHYSICS ENGLISH|Exercise Exercise Multiple Correct|5 Videos

Similar Questions

Explore conceptually related problems

A mass M is lowered with the help of a string by a distance h at a distance acceleration g//2 . The work done by the string will be

A string is used to pull a block of mass m vertically up by a distance h at a constant acceleration (g)/(3) . The work done by the tension in the string is

A block of mass m tied to a string is lowered by a distance d, at a constant acceleration of g//3 . The work done by the string is

A block of mass m tied to a string is lowered by a distance d, at a constant acceleration of g//3 . The work done by the string is

A block of mass m tied to a string is lowered by a distance d, at a constant acceleration of g//3 . The work done by the string is

A block of mass m is kept on a platform Platform starts moving upwards with an acceleration of g/2 . Find the work done by the normal force on the block in the first one second.

A block of mass 2 kg is being brought down by a string. If the block acquires a speed 1(m)//(s) in dropping down 25 cm, find the work done by the string in the process.

A cord is used to lower vertically a block of mass M , a distance d at a constant downward acceleration of (g)/(4) , then the work done by the cord on the block is

A cord is used to lower vertically a block of mass M , a distance d at a constant downward acceleration of (g)/(4) , then the work done by the cord on the block is

A body of mass m is allowed to fall with the help of string with downward acceleration (g)/(6) to a distance x. The work done by the string is