Home
Class 12
MATHS
A factory makes tennis rackets and bats,...

A factory makes tennis rackets and bats,A tennis racket takes 1.5 hours of machine and 3 hours of craftsman's time in its making,while a cricket bat takes 3 hours of machine time and 1 hour of craftman's time.In a day,the factory has availibilityof not more than 42 hours of machine time and 24 hours of craftman's time.
What no of rackets and bats must be produced if the factory is to work at full capacity?

Promotional Banner

Topper's Solved these Questions

  • INVERSE TRIGONOMETRIC FUNCTIONS

    V PUBLICATION|Exercise QUESTION BANK|80 Videos
  • MATRICES

    V PUBLICATION|Exercise QUESTION BANK|100 Videos

Similar Questions

Explore conceptually related problems

A factory makes tennis rackets and bats,A tennis racket takes 1.5 hours of machine and 3 hours of craftsman's time in its making,while a cricket bat takes 3 hours of machine time and 1 hour of craftman's time.In a day,the factory has availibilityof not more than 42 hours of machine time and 24 hours of craftman's time. if the profit on a racket and a bat isRs20 and Rs10 find maximum profit

A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns profit of Rs. 17.50 per package on nuts and Rs. 7.00 per package on bolts. Formulate the above LPP if the machine operates for at most 12 hours a day

A manufacturur produces nuts and bolts.It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts.He earns a profit of Rs.17.50 per package on nuts and Rs.7 per package on bolts.How many package of each should be produced each day so as to maximise the profit,if he operates his machine for at the most 12 hours a days? By suitable defining the variables write the objective function of the problem.

A manufacturur produces nuts and bolts.It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts.He earns a profit of Rs.17.50 per package on nuts and Rs.7 per package on bolts.How many package of each should be produced each day so as to maximise the profit,if he operates his machine for at the most 12 hours a days? Formulate the problem as a linear programming problem.

A manufacturur produces nuts and bolts.It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts.He earns a profit of Rs.17.50 per package on nuts and Rs.7 per package on bolts.How many package of each should be produced each day so as to maximise the profit,if he operates his machine for at the most 12 hours a days? Solve the LPP graphically and find the number of packages of nuts and bolts to be manufactured.

A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of a grinding/cutting machine and a sprayer. It takes 2 hours on grinding/cutting machine and 3 hours on the sprayer to manufacture a pedestal lamp. It takes 1 hour on the grinding/cutting machine and 2 hours on the sprayer to manufacture a shade. On any day, the sprayer is available for at the most 20 hours and the grinding/cutting machine for at the most 12 hours. The profit from the sale of a lamp is Rs.5 and that from a shade is Rs.3. Assuming that the manufacturer can sell all the lamps and shades that he produces, how should he schedule his daily production in order to maximise his profit?

A reaction is 50 % complete in 2 hours and 75 % complete in 4 hours . What is the order of the reaction?

Compute the speed per hour of a vehicle going 15 m / s

V PUBLICATION-LINEAR PROGRAMMING-QUESTION BANK
  1. A manufacture company makes two models A and B of a product. Each piec...

    Text Solution

    |

  2. One kind of cake requires 200g of flour and 25g of fat ,and another ki...

    Text Solution

    |

  3. A factory makes tennis rackets and bats,A tennis racket takes 1.5 hour...

    Text Solution

    |

  4. A manufacturur produces nuts and bolts.It takes 1 hour of work on mach...

    Text Solution

    |

  5. A factory manufactures two types of screws, A and B. Each type of scre...

    Text Solution

    |

  6. A cottage industry manufactures pedestal lamps and wooden shades, each...

    Text Solution

    |

  7. A company manufactures two types of rovelty souvenirs made of plywood....

    Text Solution

    |

  8. A merchant plans to sell twó types of personal computers - a desktop m...

    Text Solution

    |

  9. A diet is to contain atleast 80 units of vitamin A and 100 units of mi...

    Text Solution

    |

  10. The corner points of the feasible region determined by the following s...

    Text Solution

    |

  11. (Manufacturing problem) A manufacturer has three machines I , II and I...

    Text Solution

    |

  12. How many packets of each food should be used to maximise the amount of...

    Text Solution

    |

  13. An aeroplane can carry a maximum of 200 passengers. A profit of Rs 100...

    Text Solution

    |

  14. Two godowns A and B have grains capacity of 100 quintals and 50 quinta...

    Text Solution

    |

  15. If the grower wants to maximise the amount of nitrogen added to the ga...

    Text Solution

    |

  16. A dealer wishes to purchase a number of fans and sewing machines. He h...

    Text Solution

    |

  17. A furniture dealer deals only in two items - tables and chairs. He has...

    Text Solution

    |

  18. A company produces two types of goods, A and B, that require gold and ...

    Text Solution

    |

  19. If a young man rides his motor cycle at 25 k . p . h, he has to spend ...

    Text Solution

    |

  20. A firm deals with two kinds of fruit juices-pineapple and the, orange ...

    Text Solution

    |