Home
Class 12
PHYSICS
A block of mass 1 kg is pulled slowly al...


A block of mass 1 kg is pulled slowly along the curve path ACB by a tangential force as shown in figure. The magnitude of work done by the frictional force when the block moves from A to B is

A

`5J`

B

`10J`

C

`20J`

D

none of these

Text Solution

Verified by Experts

Promotional Banner

Similar Questions

Explore conceptually related problems

The frictional force acting on 1 kg block is

A block of mass 2 kg is pulled along circular arc from position X to Y as shown in figure. The work done by the horizontal force is pulling the block from X to Y is

Block of mass m are released from rest and they slide down the inclined surface as shown in figure. Show that the work done by the frictional forces on the blocks are same in all the cases. Also calculate the speeds with which the blocks reach point B. The coefficient of friction for all the surface is mu_k .

A block of mass 3kg is at rest on a rough inclined plan as shown in the Figure. The magnitude of net force exerted by the surface on the block will be

Block A of mass 1 kg is placed on the rough surface of block B of mass 3 kg . Block B is placed on smooth horizontal surface. Blocks are given the velocities as shown. Find net work done by the frictional force. [in (-) ve J ]. .

A block of mass 4 kg is pressed againest the wall by a force of 80N as shown in figure Determine the value of the friction force and block's acceleration (Take mu_(s) = 0.2 , mu_(s) = 0.15)

A bob of mass m is pulled along a circular arc by means of a constant horizontal force P as shown. Work done in lifting the bob from A to B is

A block of mass 10 kg is moving on a rough surface as shown in figure. The frictional force acting on block is :-

A block of mass 2 kg is released from rest on a rough inclined ground as shown in figure. Find the work done on the block by a) gravity b) force of friction .when the block is displaced downward along the plane by 2m ? . (Take g 10 m//s^(2) ).

A block of mass m is pulled slowly by a minimum constant force on a rough ( mu ) horizontal surface through a distance x. Find work done by force F.