Home
Class 12
MATHS
A square-based tank of capacity 250 cu m...

A square-based tank of capacity 250 cu m has to bedug out. The cost of land is Rs 50 per sq m. The cost of digging increases with the depth and for the whole tank the cost is Rs `400 xx (depth)^2`. Find the dimensions of the tank for the least total cost.

Promotional Banner

Topper's Solved these Questions

  • MAXIMA AND MINIMA

    ML KHANNA|Exercise SELF ASSESSMENT TEST |27 Videos
  • MAXIMA AND MINIMA

    ML KHANNA|Exercise MISCELANEOUS EXERCISE (MATCHING ENTRIES)|1 Videos
  • MAXIMA AND MINIMA

    ML KHANNA|Exercise PROBLEM SET(3) (TRUE AND FALSE )|8 Videos
  • MATRICES

    ML KHANNA|Exercise COMPREHENSION|3 Videos
  • MEASURES OF CENTRAL TENDENCY

    ML KHANNA|Exercise ASSERTION / REASON|1 Videos

Similar Questions

Explore conceptually related problems

The ratio of the costs of two vehicles is 3:2 and the total cost of the two vehicles is Rs. 50,000. Find the individual costs of the vehicles.

The length of a room is 3 times its height and breadth is 1(1)/(2) times its height.The cost of whitewashing the walls at the rate of Rs. 71.50 per sq.m is Rs.216. Find the dimensions of the room.

The length of a room is 50 per cent more than its breadth.The cost of carpeting the room at the rate of Rs38.50m^(2) is Rs924 and the cost of painting the walls at the rate of Rs 5.50 per m^(2) is 1,320. Find the dimensions of the room.

Find the cost of digging a cuboidal pit 8m long,6m broad and 3m deep at the rate of Rs30 per m^(3)

Find the cost of digging a cuboidal pit 8m long,6m broad and 3m deep at the rate of Rs*30 per m^(3)

The cost of painting if four walls of a room 12 m long at Rs. 30 per m^(2) is Rs. 7560 and th cost of covering the floor with mat at Rs. 25 per m^(2) is Rs. 2700 .Find the dimensions of the room .

The dimensions of a rectangular box are inthe ratio of 2:3:4 and the differencebetween the cost of covering it with sheet of paper at the rates of Rs 8 and Rs 9.50 per m2is Rs 1248. Find the dimensions of the box.

A rectangular plot of land is 240m by 200m . The cost of fencing per meter is Rs 30.what is the cost of fencing the entire field?