Home
Class 12
MATHS
A factory makes tennis rackets and crick...

A factory makes tennis rackets and cricket bats. A tennis racket takes 1.5 hours of machine time and 3 hours of craftman’s time in its making while a cricket bat takes 3 hour of machine time and 1 hour of craftman’s time. In a day, the factory has the availability of not more than 42 hours of machine time and 24 hours of craftsman’s time. What number of rackets and bats must be made if the factory is to work at full capacity?

Text Solution

Verified by Experts

The correct Answer is:
Rs. 200
Promotional Banner

Topper's Solved these Questions

  • LINEAR PROGRAMMING

    OMEGA PUBLICATION|Exercise Question (Miscellaneous Exercise) |8 Videos
  • INVERSE TRIGONOMETRIC FUNCTIONS

    OMEGA PUBLICATION|Exercise Multiple Choice Questions |20 Videos
  • MATRICES

    OMEGA PUBLICATION|Exercise MULTIPLE CHOICE QUESTIONS |28 Videos

Similar Questions

Explore conceptually related problems

A factory makes tennis rackets and cricket bats. A tennis racket takes 1.5 hours of machine time and 3 hours of craftman’s time in its making while a cricket bat takes 3 hour of machine time and 1 hour of craftman’s time. In a day, the factory has the availability of not more than 42 hours of machine time and 24 hours of craftsman’s time. If the profit on a racket and on a bat is Rs 20 and Rs 10 respectively, find the maximum profit of the factory when it works at full capacity.

Find: 1% of 1 hour

Amit took 3/4 hour to paint a table and 1/3 hour to paint a chair .How much time did he take in all?

A machine takes 5 hours in cutting 120 tools.How many tools will it cut in 20 hours.

A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of a grinding/cutting machine and a sprayer. It takes 2 hours on grinding/cutting machine and 3 hours on the sprayer to manufacture a pedestal lamp. It takes 1 hour on the grinding/cutting machine and 2 hours on the sprayer to manufacture a shade. On any day, the sprayer is available for at the most 20 hours and the grinding/cutting machine for at the most 12 hours. The profit from the sale of a lamp is Rs 5 and that from a shade is Rs 3. Assuming that the manufacturer can sell all the lamps and shades that he produces, how should he schedule his daily production in order to maximise his profit?

A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit of Rs17.50 per package on nuts and Rs 7.00 per package on bolts. How many packages of each should be produced each day so as to maximise his profit, if he operates his machines for at the most 12 hours a day?