Home
Class 6
MATHS
A machine, on an average, manufactures 2...

A machine, on an average, manufactures 2,825 screws a day. How many screws did it produce in the month of January 2006?

Text Solution

Verified by Experts

The correct Answer is:
87575
Promotional Banner

Topper's Solved these Questions

  • KNOWING OUR NUMBERS

    NAND LAL PUBLICATION|Exercise EXERCISE 1.3|30 Videos
  • KNOWING OUR NUMBERS

    NAND LAL PUBLICATION|Exercise ADDITIONAL QUESTIONS FOR PRACTICE (VERY SORT ANSWER TYPE QUESTIONS) |10 Videos
  • KNOWING OUR NUMBERS

    NAND LAL PUBLICATION|Exercise EXERCISE 1.1 (FILL IN THE BLANKS) |17 Videos
  • FRACTIONS

    NAND LAL PUBLICATION|Exercise DO THIS (PAGE - 155)|5 Videos
  • MENSURATION

    NAND LAL PUBLICATION|Exercise QUESTIONS|1 Videos

Similar Questions

Explore conceptually related problems

A Pictographs: Pictorial representation of data using symbols : (i) How many cares were produced in the month of July? (ii) In which month the maximum number of cars produced?

A factory requires 42 machines to produce a given number of articles in 63 days. How many machines would be required to produce the same number of articles in 54 days?

A factory manufactures two types of screws, A and B. Each type of screw requires the use of two machines, an automatic and a hand operated. It takes 4 minutes on the automatic and 6 minutes on hand operated machines to manufacture a package of screws A, while it takes 6 minutes on automatic and 3 minutes on the hand operated machines to manufacture a package of screws B. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a package of screws A at a profit of Rs 7 and screws B at a profit of Rs 10. Assuming that he can sell all the screws he manufactures, how many packages of each type should the factory owner produce in a day in order to maximise his profit? Determine the maximum profit

A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of a grinding/cutting machine and a sprayer. It takes 2 hours on grinding/cutting machine and 3 hours on the sprayer to manufacture a pedestal lamp. It takes 1 hour on the grinding/cutting machine and 2 hours on the sprayer to manufacture a shade. On any day, the sprayer is available for at the most 20 hours and the grinding/cutting machine for at the most 12 hours. The profit from the sale of a lamp is Rs 5 and that from a shade is Rs 3. Assuming that the manufacturer can sell all the lamps and shades that he produces, how should he schedule his daily production in order to maximise his profit?

A company manufactures two types of screws A and B. All the screw have to pass through a threading machine and a slotting machine. A box of type A screws requires 2 minutes on the threading machine and 3 minutes on the slotting machine. A box of type B screws requires 8 minutes of threading on the threading machine and 2 minutes on the slotting machine. in a week, each machine is available for 60 hours. On selling these screws, the company gets a profit of Rs.100 per box n type A screws and Rs.170 per box on type B screws. Formulate this problem as an LPP given that the obejctives is to maximize profit. also solve this LPP graphically to find the maximum profit.

How many ions are produced from [Ag(NH_3)_2]Cl in solution ?

A manufacturer has three machines I, II and III installed in his factory. Machines I and II are capable of being operated for at most 12 hours whereas machine III must be operated for at least 5 hours a day. She produces only two items M and N each on the three machines are given in the following table: SHe makes a profit of Rs 600 and Rs 400 on items M and N respectively. How many of each item should she produce so as to maximise her profit assuming that she can sell all the items that she produced? What will be the maximum Profit?

A carpenter was hired to build 192 window frames. The first day he made five frames and each day, thereafter he made two more frames than he made the day before. How many days did it take him to finish the job?