Home
Class 14
MATHS
In Nuts And Bolts factory, one machine p...

In Nuts And Bolts factory, one machine produces only nuts at the rate of 100 nuts per minute and needs to be cleaned for 5 minutes after production of every 1000 nuts. Another machine produces only bolts at the rate of 75 bolts per minute and needs to cleaned for 10 minutes after production of every 1500 bolts. If both the machines start production at the same time, what is the minimum duration required for producing 9000 pairs of nuts and bolts?

A

130 minutes

B

135 minutes

C

170 minutes

D

180 minutes

Text Solution

Verified by Experts

The correct Answer is:
C
Promotional Banner

Topper's Solved these Questions

  • TIME AND WORK

    DISHA PUBLICATION|Exercise Practice Exercise (Expert Level)|27 Videos
  • SET THEORY

    DISHA PUBLICATION|Exercise Test Yourself|15 Videos
  • TIME, SPEED AND DISTANCE

    DISHA PUBLICATION|Exercise Test Yourself|15 Videos

Similar Questions

Explore conceptually related problems

A machine makes 3 items in 5 minutes.Find its rate of production per minute.

Bolting hormone is

Bolting hormone is

A pumping machine pumps water at a rate of 60 cc per minute at a pressure of 1.5 atm. The power delivered by the machine is

the hormone is responsible for early seed production in conifers and bolting is

Pulse rate of a noumal person is 75 per minute. The time period of heart is

A drawer contains 50 bolts and 150 nuts.Half of the bolts and half of the nuts are rusted.If one item is chosen at random,what is the probability that it is rusted or a bolt?

In a certain factory, machines A, B and C produce bolts. Of their production. machines A. B. and c produce 2% 1 % and 3% defective bolts respectively. Machine A produces 35 % of the total output of bolts. machine B produces 25% and machine C produces 40% A bolts is chosen at random from the factory's production and is found to be defective. The probability it was produced on machine C is