Home
Class 14
MATHS
The four walls and ceiling of a room of ...

The four walls and ceiling of a room of length 25 m, breadth 12 m and height 10 m are to be painted. Painter A can paint `200 m^(2)` in 5 days, Painter B can paint `250 m^(2)` in 2 days. If A and B work together, they will finish the job in:

A

6 days

B

`6 (10)/(33)` days

C

`7 (10)/(33)` days

D

8 days

Text Solution

Verified by Experts

The correct Answer is:
A, C, D
Promotional Banner

Similar Questions

Explore conceptually related problems

A can do a piece of work in 10 days, B can do it in 15 days working together they can finish the work in :

The maxumum number of boxes , each of length 2 m , breadth 4 m and height 5 m that can be placed in a box of length 20 m , breadth 10 m and height 5 m is

The maximum number of boxes, each of length 2 m, breadth 4 m and height 5 m that can be placed in a box of length 20 m, breadth 10 m and height 5 m, is

Find the area of four walls of a room whose length is 6 m, breadth is 5 m and heigth is 4 m.

A can do a job in 12 days and B can do the same job in 6 days, in how many days working together they can complete the job?

A,B and C together can finish a job in 4 days .A and B together can finish the same job in 5 days .In how many days ,C alone will finish the same job ?

Daniel is painting the walls and ceiling of a cuboidal hall with length,breadth and height of 15m,10m and 7m respectively.From each From each can of paint 100m^(2) of area is painted.How many cans of paint will she need to paint the room?

A can do a job in 10 days, B can do the same job in 12 days and C can do the same job in 15 days. In how many days they will finish the work together?