Home
Class 14
MATHS
In Nuts And Bolts factory, one machine p...

In Nuts And Bolts factory, one machine produces only nuts at the rate of 100 nuts per minute and needs to be cleaned for 5 minutes after production of every 1000 nuts. Another machine produces only bolts at the rate of 75 bolts per minute and needs to cleaned for 10 minutes after production of every 1500 bolts. If both the machines start production at the same time, what is the minimum duration required for producing 9000 pairs of nuts and bolts?

A

130 minutes

B

135 minutes

C

170 minutes

D

180 minutes

Text Solution

Verified by Experts

The correct Answer is:
C
Promotional Banner
Recommended Questions
  1. In Nuts And Bolts factory, one machine produces only nuts at the rate ...

    Text Solution

    |

  2. A manufacturer produces nuts and bolts. It takes 1 hour of work on ma...

    Text Solution

    |

  3. A manufacturer produces nuts and bolts. It takes 1 hour of work on mac...

    Text Solution

    |

  4. एक निर्माणकर्ता नट और बोल्ट का निर्माण करता है एक पैकेट नटो के निर्माण...

    Text Solution

    |

  5. एक निर्माणकर्ता नट और बोल्ट का निर्माण करता है | एक पैकेट नटो के निर्...

    Text Solution

    |

  6. एक कारखाने में नट और बोल्ट का निर्माण होता है । एक पैकेट नटों के निर्म...

    Text Solution

    |

  7. एक निर्माणकर्ता नट और बोल्ट का निर्माण करता हैं । एक पैकेट नातों के नि...

    Text Solution

    |

  8. एक निर्माणकर्ता नट और बेल्ट का निर्माण करता हैं । एक पैकेट नटों के निर...

    Text Solution

    |

  9. (उत्पादन संबंधी समस्या) एक निर्माणकर्ता नट और बोल्ट का निर्माण करता है...

    Text Solution

    |