Home
Class 8
MATHS
A swimming pool is 30 m long, 20 m broad...

A swimming pool is 30 m long, 20 m broad and 5 m deep. Find the cost of cementing its floor and the walls at the rate of 10 per sq. metre.

A

10010

B

10000

C

10100

D

11000

Text Solution

AI Generated Solution

The correct Answer is:
To solve the problem of finding the cost of cementing the floor and walls of a swimming pool, we will follow these steps: ### Step 1: Calculate the area of the floor The area of the floor of the swimming pool can be calculated using the formula for the area of a rectangle: \[ \text{Area of the floor} = \text{Length} \times \text{Breadth} \] Given: - Length = 30 m - Breadth = 20 m So, \[ \text{Area of the floor} = 30 \, \text{m} \times 20 \, \text{m} = 600 \, \text{m}^2 \] ### Step 2: Calculate the area of the walls The swimming pool has four walls. We will calculate the area of each pair of opposite walls. 1. **Area of the two longer walls** (Length = 30 m, Height = 5 m): \[ \text{Area of two longer walls} = 2 \times (\text{Length} \times \text{Height}) = 2 \times (30 \, \text{m} \times 5 \, \text{m}) = 2 \times 150 \, \text{m}^2 = 300 \, \text{m}^2 \] 2. **Area of the two shorter walls** (Breadth = 20 m, Height = 5 m): \[ \text{Area of two shorter walls} = 2 \times (\text{Breadth} \times \text{Height}) = 2 \times (20 \, \text{m} \times 5 \, \text{m}) = 2 \times 100 \, \text{m}^2 = 200 \, \text{m}^2 \] ### Step 3: Calculate the total area to be cemented Now, we will add the area of the floor and the area of the walls: \[ \text{Total area} = \text{Area of the floor} + \text{Area of the walls} \] \[ \text{Total area} = 600 \, \text{m}^2 + (300 \, \text{m}^2 + 200 \, \text{m}^2) = 600 \, \text{m}^2 + 500 \, \text{m}^2 = 1100 \, \text{m}^2 \] ### Step 4: Calculate the cost of cementing The cost of cementing is given at the rate of 10 per square meter. Therefore, we can calculate the total cost: \[ \text{Total cost} = \text{Total area} \times \text{Rate per square meter} \] \[ \text{Total cost} = 1100 \, \text{m}^2 \times 10 = 11000 \] ### Final Answer The total cost of cementing the floor and the walls of the swimming pool is **11000**. ---
Promotional Banner

Topper's Solved these Questions

  • IMO MODEL TEST PAPER 1

    SCIENCE OLYMPIAD FOUNDATION |Exercise ACHIEVERS SECTION |5 Videos
  • IMO MODEL TEST PAPER 1

    SCIENCE OLYMPIAD FOUNDATION |Exercise ACHIEVERS SECTION |5 Videos
  • IMO MODEL TEST PAPER -3

    SCIENCE OLYMPIAD FOUNDATION |Exercise Achievers Section|5 Videos
  • IMO MODEL TEST PAPER 2

    SCIENCE OLYMPIAD FOUNDATION |Exercise ACHIEVERS SECTION |5 Videos

Similar Questions

Explore conceptually related problems

A pool is 20m long,15m broad and 4m deep FInd the cost of cementing its floor and its wall at the rate of Rs.12 per square metre.

A swimming pool is 50 m in length,30 m in breadth and 2.5 m in depth. Find the cost of cementing its floor and walls at the rate of Rs 27 per square metre.

A swimming pool is 20m in length,15m in breadth,and 4m in depth.Find the cost of cementing its floor and walls at the rate of Rs.12 per square metre.

A swimming pool is 20m long 15m wide and 3m deep. Find the cost of repairing the floor and wall at the rate of Rs. 25per square metre.

A swimming pools is 20m in length,15m in breadth,and 4m in depth.Find the cost of cementing its floor and walls at the rate of Rs.12 per square metre.

A godown is 50 m long, 40 m broad and 10 m high. Find the cost of whitewashing its four walls and ceiling at Rs.20 per square metre.

Find the cost of fencing a square park of side 300m at the rate of Rs.20 per metre.

Find the cost of fencing a square park of side 250 m at the rate of Rs. 20 per metre.

A room is 13 m long and 9 m broad. Find the cost of carpenting the room which a carpet 75 cm broad at the rate of Rs 65 per metre.