A firm makes pants and shirts . A shirt ...

A firm makes pants and shirts . A shirt takes 2 hours on machine and 3 hours of man lobour while a pant takes 3 hours on machine and 2 hours of man labour .In a week , there are 70 hours of machine and 75 hous of man lobour available . If the firm dertermines to make x shirts and y pants per week , then for this linear constraints are

A

`xge0,yge0,2x+3yge70 , 3x+2yge75`

B

`xge0,yge0,2x+3yle70 , 3x+2yge75`

C

`xge0,yge0,2x+3yge70 , 3x+2yle75`

D

`xge0,yge0,2x+3yle70 , 3x+2yle75`

Text Solution

Verified by Experts

The correct Answer is:
D
Promotional Banner

Topper's Solved these Questions

  • LINEAR PROGRAMMING

    TARGET PUBLICATION|Exercise Competitive Thinking|35 Videos
  • LINEAR PROGRAMMING

    TARGET PUBLICATION|Exercise Evaluation Test|11 Videos
  • LINEAR PROGRAMMING

    TARGET PUBLICATION|Exercise Evaluation Test|11 Videos
  • LINE

    TARGET PUBLICATION|Exercise Evaluation Test|1 Videos
  • MATHEMATICAL LOGIC

    TARGET PUBLICATION|Exercise EVALUATION TEST|14 Videos

Similar Questions

Explore conceptually related problems

A machine takes 5 hours to cutting 120 tools. How many tools will it cut in 20 hours?

A factory makes tennis rackets and cricket bats. A tennis racket takes 1. 5 hours of machine time and 3 hours of craftmans time in its making while a cricket bat takes 3 hours of machine time and 1 hour of craftmans time. In a day, the factory has the availability of not more than 42 hours of machine time and 24 hours of craftsmans time. If the profit on a racket and on a bat is Rs. 20 and Rs. 10 respectively, find the number of tennis rackets and crickets bats that the factory must manufacture to earn the maximum profit. Make it as an L.P.P. and solve graphically.

A factory makes tennis rackets and cricket bats. A tennis racket takes 1.5 hours of machine time and 3 hours of craftman"s time m its making while a cricket bat takes 3 hour of machine time and 1 hour of craftman"s time. In a day, the factory has the availability of not more than 42 hours of machine time and 24 hours of craftsman"s time. (i) What number of rackets and bats must be made if the factory is to work at full capacity? (ii) If the profit on a racket and on a bat is Rs 20 and Rs 10 respectively, find the maximum profit of the factory when it works at full capacity.

A manufacturer produces nuts and bolts. It takes 2 hours work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 2 hours on machine B to produce a package of bolts. He earns a profit of Rs. 24 per package on nuts and Rs. 18 per package on bolts. How many packages of each should be produced each day so as to maximize his profit, if he operates his machines for at the most 10 hours a day. Make an L.P.P. from above and solve it graphically ?

A printing company prints two types of magzines A and B. The company earns Rs. 20 and Rs. 30 on each copy of magazines A and B respectively. The magazine A requires 2 hours on machine I, 4 hours on Machine II and 2 hours machine III. Magazine B requires 3 hours on machine I, 5 hours on machine II and 3 hours on machine III. Machines I,II, III are available for 35, 50 and 70 hours per week respectively. Formulate the LPP to determine weekly production of magazines A and B, so that the total profit is maximum

TARGET PUBLICATION-LINEAR PROGRAMMING-Critical Thinking
  1. A printing company prints two types of magazines A and 8. The company ...

    Text Solution

    |

  2. A firm makes pants and shirts . A shirt takes 2 hours on machine and 3...

    Text Solution

    |

  3. A factory owner wants to purchase 2types of machines A ,and B for his ...

    Text Solution

    |

  4. A small firm manufactures necklaces & bracelets . The combined number ...

    Text Solution

    |

  5. Food X contains 4 units of vitamin A per gram and 7 units of vitamin B...

    Text Solution

    |

  6. Two different kinds of food A and B are being considered to form a wee...

    Text Solution

    |

  7. The region represented by the inequation system x,yge0,yle5,x+yle4 i...

    Text Solution

    |

  8. The region in the xy plane given by y-xle1,2x-6yle3,xge0,yge0 is

    Text Solution

    |

  9. The region represented by 2x+3y-5ge0 and 4x-3y+2ge0 is

    Text Solution

    |

  10. The contraints -x+yle1,-x+3yle9,xge0,yge0 of LLP correspond to

    Text Solution

    |

  11. The position of points O (0,0) and P (2,-2) in the region of graph of ...

    Text Solution

    |

  12. The vertex of common graph of inequalities 2x+yge2 and x-yle3 , is

    Text Solution

    |

  13. The constraints of an LPP are x+yle6,3x+2yge6,xge0 and yge0 Determine ...

    Text Solution

    |

  14. The constraints of an LPP a 5lexle10,5leyle10 Determine the vertices o...

    Text Solution

    |

  15. Which of the following is not a vertex of the feasible region bounded ...

    Text Solution

    |

  16. Maximum value of p=6x+8y subject to 2x+y le 30, x + 2y le 24, x ge ...

    Text Solution

    |

  17. Maximum value of 12x+ 3y subjected to the constraints xge0,yge0,x+yle5...

    Text Solution

    |

  18. Maximise Z=5x+3y Subject to 3x+5yle15, 5x+2yle10,xge0,yge0.

    Text Solution

    |

  19. For the function z = 4x+ 9y to be maximum under the constraints x+5yl...

    Text Solution

    |

  20. The corner points of the feasible region determined by the system of l...

    Text Solution

    |