Home
Class 11
PHYSICS
A bucket tied to a string is lowered at ...

A bucket tied to a string is lowered at a constant acceleration of `g//4`. If mass of the bucket is m and it is lowered by a distance /then find then work done by the string on the bucket.

A

`(1//4) mg d`

B

`(-3//4)mgd`

C

`(-4//3)mgd`

D

`(4//3)mgd`

Text Solution

Verified by Experts

The correct Answer is:
B

Let tension in string be `T`, then work done by tension `T=-Td`
Applying newton's second law on the bucket
`mg-T=m((g)/(a))`
`or T=(3)/(4)mg`

`:.` required work down `=-(3)/(4) mg d`
Promotional Banner

Topper's Solved these Questions

  • DAILY PRACTICE PROBLEMS

    RESONANCE|Exercise Dpp 37|8 Videos
  • DAILY PRACTICE PROBLEMS

    RESONANCE|Exercise dpp 38|5 Videos
  • DAILY PRACTICE PROBLEMS

    RESONANCE|Exercise DPP 35|5 Videos
  • CURRENT ELECTRICITY

    RESONANCE|Exercise Exercise|54 Videos
  • ELASTICITY AND VISCOCITY

    RESONANCE|Exercise Advanced Level Problems|9 Videos

Similar Questions

Explore conceptually related problems

A bucket of mass 'm' tied to a light rope is lowered at a constant acceleration of g//4 . IF the bucket is lowered by a distance 'd' , the work done by the rope will be (neglect the mass of the rope)

A bucket of mass 4//3 is tied to a string and is lowered at a constant acceleration of g//4 . The magnitude of work done (in joule ) by the string in lowering the bucket by 10 cm would be :

A block of mass m tied to a string is lowered by a distance d, at a constant acceleration of g//3 . The work done by the string is

A cord is used to vertically lower an initially stationary block of mass M at a constant downward acceleration of g/4. When the block has fallen a distance d, find (a) the work done by the cord's force on the block, (b) the work done by the graviational force on the block, (c) the kinitic energy of the block, and (d) the speed of the block.

A block of mass 5kg is being raised vertically upwards by the help of a string attached to it. It rises with an acceleration of 2ms^-2 . Find the work done by the tension in the string if the block rises by 2.5m . Also find the work done by the gravity and the net work done.

A 20 kg bucket is lowered by a rope with constant velocity of 0.5m/s. What is the tension in the rope? A 20kg bucket is lowered with a constant downward acceleration of 1m//s^(2) . What is the tension in the rope? A 10kg bucket is raised with a constant upward acceleration with same magnitude a.

A cord is used to lower vertically a block of mass M through a distance d at a constant acceleration g//4 . Find the work done by the cord on the block.

A bucket full of water weighs 5 kg, it is pulled from a well 20 m deep. There is a small hole in the bucket through which water leaks at a constant rate. If it is observed that for every meter the bucket loses 0.2 kg mass of water, then the total work done in pulling the bucket up from the well is [g = 10ms^(-2) ]