Home
Class 11
PHYSICS
One - fourth chain is hanging down from ...

One - fourth chain is hanging down from a table. Work done to bring the hanging part of the chain on to the table is (mass of chain = M and length = L)

A

`(Mgl)/(32)`

B

`(Mgl)/(16)`

C

`(Mgl)/(8)`

D

`(Mgl)/(4)`

Text Solution

Verified by Experts

The correct Answer is:
A
Promotional Banner

Topper's Solved these Questions

  • WORK, POWER & ENERGY

    AAKASH SERIES|Exercise PRACTICE EXERCISE (EMERGY)|31 Videos
  • WORK, POWER & ENERGY

    AAKASH SERIES|Exercise PRACTICE EXERCISE (POWER)|9 Videos
  • WORK, POWER & ENERGY

    AAKASH SERIES|Exercise PRACTICE EXERCISE (SCALAR (OR) DOT PRODUCT)|9 Videos
  • WORK POWER ENERGY

    AAKASH SERIES|Exercise EXERCISE - 3|61 Videos

Similar Questions

Explore conceptually related problems

A uniform chain of mass.m. and length .L. is kept on a horizontal table with half of its length hanging from the edge of the table. Work done in pulling the chain on to the table so that only 1/5 th of its length now hangs from the edge is

A metal chain of mass 2 kg and length 90 cm over hangs a table with 60 cm on the table. How much work needs to be done to put the hanging part of the chain back on the table? (Let g=10m//s^(2) )

Half of the chain is lying on a table. The rest of the chain hangs in equilibrium from both of the ends of the table. Extra length of the hanging chain at one end is 1/8 th of the total length of the chain than that hanging at the other end. The coefficient of friction between table and chain is 25 xx 10^(-4) the value of x is

A uniform chain of length L is lying on the horizontal table.If the coefficient of friction between the chain and table top is m, what is the maximum length of the chain that can hang over the edge of the table without disturbing the rest of the chain on the table?

AAKASH SERIES-WORK, POWER & ENERGY -PRACTICE EXERCISE (WORK)
  1. The work done in moving a body of mass 5kg from the bottom of a smooth...

    Text Solution

    |

  2. A body of mass 15 kg is raised from certain depth. If the work done in...

    Text Solution

    |

  3. A bucket filled with water having a mass of 15 kg is raised from a wel...

    Text Solution

    |

  4. A block of mass 6kg is lowered with the help of a rope of negligible m...

    Text Solution

    |

  5. A force vec(F) = (4hat(i) - 3hat(j) - 5hat(k)) N moves a body for (3ha...

    Text Solution

    |

  6. A uniform rope of length .L. and linear density .mu. is on a smooth ho...

    Text Solution

    |

  7. One - fourth chain is hanging down from a table. Work done to bring th...

    Text Solution

    |

  8. A person of mass 50 kg carrying a box walks up a staircase. The height...

    Text Solution

    |

  9. A rectangular block of dimensions 10m xx 6m xx 3m is lying on a horizo...

    Text Solution

    |

  10. With the application of a force of 20N, the momentum of a body of mass...

    Text Solution

    |

  11. A uniform rod of mass 2kg. And length 1m is lying on a horizontal surf...

    Text Solution

    |

  12. A ladder .AB. of weight 300 N and length 5 m is lying on a horizontal ...

    Text Solution

    |

  13. The force - displacement graph is shown in the figure. The work done i...

    Text Solution

    |

  14. A constant force is applied on a 10kg mass at rest. The ratio of works...

    Text Solution

    |

  15. A body of mass 12 kg is at the bottom of a lake of depth 5 m. If the w...

    Text Solution

    |

  16. The work done against friction in moving a body from A to B is 200 J. ...

    Text Solution

    |